MethodologyVersion 0.1, July 2026
SAIL Ledger estimation methodology
How SAIL Ledger estimates the energy, water and carbon of AI requests, the public data it’s anchored to, and its known limits.
SAIL publishes its methods openly, so anyone can check our numbers and build on them. Our publication, Carbon Neutral Data Center, tracks the AI buildout as it happens.
MethodologyVersion 0.1, July 2026
How SAIL Ledger estimates the energy, water and carbon of AI requests, the public data it’s anchored to, and its known limits.
In developmentDraft for review
An operating and reporting framework for carbon neutral data centers.
Draft sections will be published here for comment. Get drafts by email.
Updated continuously
Daily headlines, weekly rundowns and deep dives on the power, carbon, water and capital behind AI infrastructure.
The Senate voted 73-25 on Monday, Nov. 9, 2026, to invoke cloture on a motion to proceed to the Bipartisan American Affordability and Jobs Act (BAAJA). An amendment process comes next, and it is not public how many amendments will get votes or how fast debate will move. After the White House issued a statement endorsing the bill, President Trump said "The bill hasn't been fully negotiated" and that he won't approve wind turbines even if it becomes law.
The Indiana Utility Regulatory Commission approved, 5-0, AES Indiana's plan to build or acquire generation, storage and grid assets for a 390-MW Google data center in Monrovia, at an estimated project cost of about $737 million (Oct. 7 order). Google will pay about $32 million upfront for the direct connection, while $73.8 million in network upgrades goes into the transmission rate base and is recovered from all customers. Consumer advocates say this shifts costs to other ratepayers, while AES says Google's contract revenue will more than offset residential customers' share.
Deutsche Telekom announced a 20MW expansion of its Industrial AI Cloud (AI factory) at Munich's Tucherpark, adding Nvidia Blackwell Ultra (B300) GPUs alongside RTX PRO 6000 Blackwell Server Edition and B200 GPUs. The site went live in February 2026, and Deutsche Telekom said the initial deployment raised available AI computing capacity in Germany by 50 percent and was fully booked within seven months.
Boosteroid, Gaw Capital and Firebird AI have announced plans for a 480MW data center in Kazakhstan. It would be part of phase two of the "Data Center Valley" project, which targets 1GW by 2029. The source does not state a site, capex, power supply or construction timeline.
The Science Based Targets initiative opened a 30-day public consultation on Nov. 5 on clarifications to scope 2 guidance in its updated Corporate Net Zero Standard, which takes effect Feb. 1, 2027. The proposals would grandfather contracts signed before that date, and include a preliminary list of deliverability regions and a revisit of load aggregation limits under long-term contracts. SBTi said the clarifications address about 40% of the scope 2 topics raised by stakeholders, and the GHG Protocol expects to release further scope 2 revisions for public consultation in Q2 2027.
Riot Platforms signed a 910MW IT capacity triple-net lease for its Corsicana campus in Navarro County, Texas, running 15 years with two five-year extensions. The contract is valued at $28 billion, rising to $54 billion if all extensions are exercised. Capacity is to be delivered in phases: 400MW in September 2027, 200MW in January 2028 and 310MW in July 2028.
PPL raised its base capital plan to $25B for 2027 through 2030, $2B more than the prior plan, primarily due to a proposed 645 MW combined-cycle gas plant in Kentucky. If regulators approve, the plant is expected to reach commercial operations in the second quarter of 2032. PPL's Kentucky pipeline stands at 14.7 GW of potential load growth through 2032 (12.8 GW from data centers), and advanced-stage data center projects in Pennsylvania total 35.3 GW.
The Information reports that Nvidia pitched Apollo Global Management, Brightspeed's parent, on using legacy central offices as Edge compute nodes for a new inference network. The roughly 130 buildings could reportedly host up to 1 GW of GPU compute, with first capacity possibly live as soon as Q1 2027. The companies are reportedly sharing information and arranging site visits, and nothing has been confirmed.
Norway's government has temporarily halted the reservation of grid connections for new data centers until regulations are in place, according to Statnett. About 800MW of data centers are connected, 4.2GW is reserved, 9.1GW is in the capacity queue and another 18GW is requested, against national peak demand of 25GW (not all projects would be built). Projects already connected or grid-approved are unaffected, and a new licensing scheme is expected to favor defense, emergency, health and other critical infrastructure.
Mavria, founded by former US DOE staffers and based in The Woodlands, Texas, says it has raised $130m across pre-seed and seed rounds, with the latest round led by Paradigm. Its first product, Terrain, is a 5MW factory-built unit with integrated power distribution, direct liquid cooling, controls and IT racks, and is in production in Houston. The company told the WSJ that testing is slated for early 2027, with assembly lines expected to scale output by mid-2027.
Google Cloud announced two new TPUs on November 9, 2026: TPU 8tx, built on TPU 8t silicon with hardware-level encryption for secure inference and small-scale training, and TPU 8i Max, which combines two TPU 8i chips in one package. Google says TPU 8i Max doubles compute, SRAM, and HBM bandwidth versus TPU 8i and delivers 384 GB of high-bandwidth memory. Google also said select customers will be able to deploy TPU 8tx in their own data centers.
Anthropic has signed a $3.4bn deal for gas generators to support 1.7GW of data center power, according to Data Center Dynamics (published 2026-11-09). The agreement takes over an existing OnePWR order of Caterpillar gen-sets. The source excerpt does not give sites, delivery dates, or emissions details.